Australian Catholic University Signadou Campus Veritas Building

Client: Australian Catholic University
Location: Australian Capital Territory
Project: New Two-storey Education Building, constructed at the fully operational ACU Watson Campus
Completion Date: March 2018
Completion Time: 13 Months
Value: $14.6 Million

The Veritas building project consists of the construction of a new 2 story building with a gross floor area of 3194m2. As the new heart of the Campus, the building sits between two existing buildings with covered walkways linking all three. The new building provides the Australian Catholic University with state-of-the-art library facilities, flexible learning areas, a modernised lecture space, staff amenities and an inviting student cafe’ and common areas to encourage collaboration, imagination and creativity to nurture our high achievers of the future.